About Us

About Us

STIFFCON ENGINEERING PLC (AKA Seyoum Dawed BC) was first established as SIYOUM DAWED GENERAL CONTRACTOR in the capital city of Addis Ababa. After working in the profession for six consecutive years finally STIFFCON ENGINEERING PLC emerged with a new vision of changing the working trends in the Building Construction Industry. Thus STIFFCON ENGINEERING PLC finally established as category II Building Contractor by the year 2007 E.C.

Technical and Administration units of the company, who administer the day-to-day activities of the Engineering and Administration sectors of the firm. The General Manager is the executive body of the firm responsible for decision-making, policy issues, technical issues and coordination of other units.

The Project Engineers are further assisted by experienced Foreman, who are assigned on site to administer the day-to-day activities of the project. The project manager will be responsible for the programming of the day-to-day construction activities of the project by organizing the labor, material and equipment and evaluation of performances as well. He directs the Foremen with the objective of assuring quality product and timely completion of each unit of work accordingly with the present schedule.

In the future, we will focus on capacity building in general and specifically on building-up of reputation, staff development, systems design and improvement, quality control, costing and modern construction techniques.

Building Staffs

History Emphasis

Economic Outcomes

Safety First in Construction Site Operations

Safety Measures

The construction industry is highly exposed to the accidents. Accidents may cause injury, which sometimes result in death or permanent total displacement. Researches shows that 98% accidents can be avoided and only 2% cannot be pre-assessed. The cost of the accident cannot be expressed in monetary terms only. It also affects the individual, his family and society as a whole. Its social aspect are very tragic because for family and accident may mean economic dependence from independence which adversely affects the social relation of the family. After the accident, mental attitude also changes.

Therefore, our company will follow accepted safety procedure which is being summarized under. Besides, the health and safety procedures based on different international standards of safety procedures based on the scope of the works:

  • Working at safe speed
  • Loading machines not beyond their capacity
  • Using safety device
  • Adopting safe procedures
  • Train employees about safety
  • Normal working hour not to have accident due to tiredness
  • Providing proper safety protection devices
  • Safety measures include special clothes for protection of body such as gloves, apron, goggles etc.
  • Always wear safety helmet and reflector when working in the construction site

Safety Education and Training

The company will adopt training facilities for the project which is to be provided in cooperation with the implementation agency in safety measures to the workers and to all management staff of the project. The purpose of this training is to induce cure in the use of dangerous tools or in carry out risk operation. 

The Detail Environmental and safety program will be mentioned in the management strategy and Implementation Plan (MSIP) documents.

 

Green Construction Technology

Green building technology uses advanced technologies to develop buildings with minimal impact on the environment in all the lifecycle stages: from design, construction, operation, maintenance, and renovation, to demolition.

But with different central, foremost considerations like energy consumption and water use, natural air conditioning, indoor environmental (HVAC) quality, material section and the building’s effects on its site.”

Using green technology in construction is linked with software, items, or methods used for constructing green buildings. It can have a lower-than-average impact on the planet.

Green construction focuses on reducing water, energy, and materials after the building is built. It also uses smart energy-saving technology to build zero-energy homes with fewer greenhouse gases impacting the environment.

Using aggressive estimations, you can also use the lean construction method to reduce waste on a construction site. It can save money and reduce the project’s environmental impact. 

Multiple holistic methods can be used in green construction to reduce construction projects’ carbon footprint. Being a construction business owner, you should focus on sustainable construction technology that can be cost-effective and durable to be worth investing in.

 

Core Values

 

  • Provision of efficient, effective and fair construction services which are tailored to the best satisfaction of our customers.
  • Efficient and effective utilization of our resources.

What makes us different?

 

  • We assure customers cost effective, reliable and prompt supply or delivery service in Ethiopia.
  • With the supply of high quality products, employing highly qualified professionals and energetic supporting staff, we have built a capacity to handle supplies intended for projects in quality, timely and within client’s budget.